Name: ERW Steel Tube, thick wall aluminum tubing

304 round pipe stainless steel seamless pipe for petrochemical industry

Quick Detail:

Standard: GB/T 14975-2002, GB/T 14976-2002, GB 13296-91; ASTM A213, ASTMA312, ASTMA269,JIS G3459, JIS G3463, JIS G3448, DIN17458
Steel Grade: TP316L
Size: Out Diameter : 20-200mm
Thickness: 0.1-20mm
Length: 3-8m

Description:

standard

GB/T 14975-2002, GB/T 14976-2002, GB 13296-91; ASTM A213, ASTM A312, ASTM A269, JIS G3459, JIS G3463, JIS G3448, DIN17458

Steel grade

TP304, TP304L, TP316, TP316L, TP347, TP347H, TP321 ,TP321H, TP310, TP310S, TP410, TP410S, TP403, S31803/S32205, S32750, S32760

Outside diameter

20mm-200mm

Thickness

0.1mm-20mm

Length

3m-8m

End protection

Plastic caps

Outside coating

Black painting, anti-corrosion oil, galvanized or as per required by customers

Packing

wooden boxes, plastic bags or according to different customers’ requests

Inspection and test

UT, ET, HT, RT, etc. and others according to the standard, or as the requests of the customers

Delivery condition

Annealed, Normalized, Normalized and tempered

Mechanical properties:

Mechanical properties

Tensile strength

Yield strength

Elongation

High Voltage

≥520Mpa

≥205Mpa

≥40%

≤200Mpa

Application:

Stainless steel is a production which not easy rust, acid resistance and corrosion resistance, so it is widely used in light industry, heavy industry, daily necessities and the decoration industry, such as: Petrochemical industry, chemical fertilizer industry, oil refining industry, oil and gas industry, light industry and food industry, pulp and paper industry, energy and environmental industries.

Competitive advantage:

Jiangsu Hengyang Steel Pipe Co., Ltd is a pipe manufacturing, we have the latest machine and the professional technicians. We aim at offering high quality but competitive price pipe for our global customers.

Product Details:

Place of Origin: Shanghai
Brand Name: hengyang
Certification: ISO
Model Number: HC

Payment & Shipping Terms:
Minimum Order Quantity: 5 tons
Packaging Details: According to per customers’ require
Delivery Time: 30-60 days after the advance payment to the account(exclusion the national holiday)
Payment Terms: 30% advance, the balance is paid before delivery
Supply Ability: 800 tons per month